Waterside Green development covers an area of about 73 hectares and consists of constructing more than 700 residential and commercial buildings, a community hall, noise walls, bridges, internal roads and several lakes, measuring about 20ha in area, in low-lying land affected by high groundwater levels and the presence of saline and sodic soils.

Sydney West Link Upgrade

Geotechnique provided geotechnical investigations, subsurface drilling, and pavement design for the Sydney West Link upgrade. The project involved complex soil conditions and required slope stability and foundation analysis to ensure long-term structural integrity under high-traffic conditions.