Heavy rainfall in 2022 triggered a landslide in the Nepean River that extended across the entire width of the site.

Sydney West Link Upgrade

Geotechnique provided geotechnical investigations, subsurface drilling, and pavement design for the Sydney West Link upgrade. The project involved complex soil conditions and required slope stability and foundation analysis to ensure long-term structural integrity under high-traffic conditions.