Geotechnique assessed ground conditions and provided geotechnical recommendations on the design of retaining structures and footings of a new residential building with seven storeys above ground and two levels of basement car park, requiring up to about 6.0m deep excavation.

Sydney West Link Upgrade

Geotechnique provided geotechnical investigations, subsurface drilling, and pavement design for the Sydney West Link upgrade. The project involved complex soil conditions and required slope stability and foundation analysis to ensure long-term structural integrity under high-traffic conditions.